Goldwind announces new GW 6S offshore smart wind turbine platform
First commercial deployment of offshore turbines for China's largest wind turbine OEM.
Xinjiang Goldwind Science & Technology Co. Ltd. has launched its latest GW6S offshore platform at last month's China Wind Power exhibition. The 6S turbine platform includes three new offshore wind turbines. The turbines are available with rotor diameters ranging from 154 to 171 meters and are a direct evolution of Goldwind's permanent magnet direct drive (PMDD) turbine technology.
In September, the first blades for the 6.7MW offshore prototype with a length of 75.1 meters were produced. A prototype of the GW154/6.7MW will be installed in early 2018 and is designed for wind class I areas off the Fujian and Guangdongcoast, east of China.
The turbine's expected commercial deployment is during the first quarter of 2018 and target offshore markets outside of China include Japan, South Korean and, later, Europe.
Related Content
-
Plant tour: ÉireComposites, Galway, Ireland
An in-house testing business and R&D focus has led to innovative materials use and projects in a range of markets, from civil aerospace to renewable energy to marine.
-
Moving toward next-generation wind blade recycling
Suppliers, fabricators and OEMs across the composite wind blade supply chain ramp up existing technologies, develop better reclamation methods and design more recyclable wind blades.
-
Drag-based wind turbine design for higher energy capture
Claiming significantly higher power generation capacity than traditional blades, Xenecore aims to scale up its current monocoque, fan-shaped wind blades, made via compression molded carbon fiber/epoxy with I-beam ribs and microsphere structural foam.