Goldwind announces new GW 6S offshore smart wind turbine platform
First commercial deployment of offshore turbines for China's largest wind turbine OEM.
Xinjiang Goldwind Science & Technology Co. Ltd. has launched its latest GW6S offshore platform at last month's China Wind Power exhibition. The 6S turbine platform includes three new offshore wind turbines. The turbines are available with rotor diameters ranging from 154 to 171 meters and are a direct evolution of Goldwind's permanent magnet direct drive (PMDD) turbine technology.
In September, the first blades for the 6.7MW offshore prototype with a length of 75.1 meters were produced. A prototype of the GW154/6.7MW will be installed in early 2018 and is designed for wind class I areas off the Fujian and Guangdongcoast, east of China.
The turbine's expected commercial deployment is during the first quarter of 2018 and target offshore markets outside of China include Japan, South Korean and, later, Europe.
Related Content
-
McClarin Composites partners with ExxonMobil to accelerate high-speed RTM
Multimillion-dollar investment to drive next-gen automated RTM technology will open new applications and markets for composites OEMs.
-
How AI is improving composites operations and factory sustainability
Workforce pain points and various logistical challenges are putting operations resilience and flexibility to the test, but Industry 4.0 advancements could be the key to composites manufacturers’ transformation.
-
SAM XL demonstrates closed-loop digital methodologies via full-size aerocomposite parts development
PeneloPe Project’s modular, zero-defect manufacturing deliverables are being highlighted in an upcoming video that demonstrates the resulting aerospace pilot line’s feasibility.