Vertical advances certification with second Valo eVTOL prototype flight
The second full-scale prototype will accelerate flight testing, support piloted demonstrations and advance Vertical Aerospace’s hybrid-electric aircraft program.
Vertical test pilot Paul Stone conducted the latest prototype's maiden flight on June 5. Source | Vertical Aerospace
On June 9, Vertical Aerospace (London, U.K.) announced its latest full-scale prototype vertical takeoff and landing (eVTOL) aircraft had completed its maiden piloted flight at the company’s Flight Test Centre in the U.K., marking the start of an expanded flight test campaign.
The flight follows the issuance of a new Permit to Fly from the UK Civil Aviation Authority (CAA) after extensive ground testing and aircraft validation activities. Meanwhile, Vertical’s existing prototype continues transition flight testing, having completed multiple piloted transition flights.
The new prototype is the final aircraft to join Vertical’s flight test fleet before the company completes critical design review (CDR). Following CDR, Vertical will begin preparations for assembly of its first pre-production aircraft as it continues toward certification and commercial service.
This aircraft doubles the company’s flight testing capacity and supports additional public demonstrations in 2026. Following the completion of all flight test phases — thrustborne, wingborne and transition flight — in its all-electric configuration, Vertical intends to retrofit this prototype for hybrid-electric flight testing. The hybrid-electric variant is expected to support applications demanding greater range and payload capability across defense, logistics and wider commercial sectors.
The prototype shares the same configuration as Vertical’s current full-scale aircraft, which has already completed all flight test phases. The company’s flight test program is built around full-scale, piloted prototype aircraft with architecture, systems and flight characteristics closely aligned to the production-standard Valo aircraft, enabling the company to validate the technologies, systems integration and flight models that will support certification.
Related Content
-
Composites End Markets: Aviation and Advanced Air Mobility (2026)
Market outlook highlights commercial, defense and bizjet upturn, shift to Asia/rise of India while supply chain struggles to meet rate, AAM begins pivot toward commercial routes plus trends in civil UAS, electric aircraft and the latest in composites developments.
-
Airbus puts a pause on CityAirbus NextGen eVTOL program
Airbus Helicopters is hitting the breaks on program progress, citing that battery technologies need to evolve before it can launch a successful UAM program.
-
Joby conducts FAA testing, moves into final certification
Successful static loading testing of tail structure and Type Inspection Authorization by FAA pilots moves Joby closer to its 2025 targets.