NSTA issues second permit for HyNet carbon storage project
The £2 billion U.K. project targets the use of new and existing hydrogen and CCUS technologies to capture and store more than 100 million tonnes of CO2 over 25 years, boosting net-zero initiatives.
Share
The North Sea Transition Authority (NSTA, Aberdeen, U.K.) has awarded three carbon storage permits to energy company Eni SpA (Rome, Italy) for Liverpool Bay CCS, the CO2 transportation and storage system which will serve the HyNet industrial cluster.
HyNet is a U.K. project that aims to decarbonize the North West of England and North Wales through the use of hydrogen and carbon capture, usage and storage (CCUS) technologies. HyNet will upgrade existing infrastructure, as well as the develop new infrastructure. This includes underground pipelines, hydrogen production plants and storage facilities.
Phase one of HyNet is designed to store 109 million tonnes of CO2 in the East Irish Sea over 25 years — the equivalent of taking 60.1 million cars off the road for a year.
The awarded permits enable Eni start preparing the stores for the initial injection of 4.5 million tonnes of CO2 per year starting as soon as mid-2028. They were issued alongside the economic license awarded by the Department for Energy Security and Net Zero.
Carbon storage is a vital cog in the U.K.’s clean energy future and the NSTA is playing a major role in ensuring the sector reaches its full potential. The NSTA awarded its first-ever carbon storage permit to the Northern Endurance Partnership (NEP) for a site in the Southern North Sea in December 2024. The regulator also launched a large-scale carbon storage licensing round in 2022, resulting in 21 awards the following year.
HyNet will be served by a combination of new infrastructure and existing infrastructure which will be repurposed for carbon transportation and storage. In total, more than 90 miles of offshore and onshore pipeline will be given a new lease of life, delivering substantial cost savings and cutting the environmental impact associated with the construction, transportation and installation of new kit.
A new platform will be installed at the Douglas field to receive CO2 from the Point of Ayr Gas Terminal in Flintshire, Wales. From there, the CO2 will be transported onward to the Hamilton, Hamilton North and Lennox depleted oil and gas reservoirs operated by Eni in Liverpool Bay, for permanent storage.
“Thanks to the North Sea, we have one of the greatest carbon storage potentials of any country,” says energy secretary Ed Miliband.
Related Content
PUR composite sandwich panels for 3D automotive parts, high-volume panels and more
At its U.S. sites, Ascorium produces glass fiber/PUR 3D parts via semi-automated molding, high-volume flat panels via a continuous line while working toward bio-based PUR and recycling.
Read MoreJEC World 2025 highlights: Evolving recycling and biomaterials technologies
CW technical editor Hannah Mason shares sustainability-focused composites trade show highlights featuring maturation, scale-up, new partnerships, and new technologies in biomaterials and recycling.
Read MoreWhat is the future for Owens Corning Glass Reinforcements?
An industry pioneer discusses divergent visions in a global industry, consolidation and growth in Asia, doubling market share and tells a composites sustainability story involving circular fibers.
Read MoreAFP with very-thin plies of carbon fiber/LMPAEK prepreg for sustainable helicopter structures
DLR, Airbus Helicopters, Fraunhofer and TU Dresden work in the NATURE project for environmentally friendly aviation
Read MoreRead Next
Thermoplastic composite pipes provide 59% reduction in H2 distribution CO2 emissions
Hive Composites’ multilayer thermoplastic composite pipe (TPC) design meets hydrogen permeation requirements while ensuring substantial CO2 reductions compared to conventional steel pipe systems.
Read MoreUTComp methodology enables nondestructive evaluation of phosphoric acid FRP piping system
Recent customer case study involved repeatable and scalable assessment of FRP composite pipes’ mechanical integrity via its UltraAnalytix NDT system.
Read MorePost Cure: Metal-composite connector supports direct joining to steel pipes
FAUSST weldable hybrid fabric by Hyconnect GmbH makes it possible to join metal-composite joints with reduced risk and labor.
Read More