Search Results
Showing 1 – 10 of 55 resultsThe lunar lander, complete with Type 5 pressure vessels, was deployed on Feb. 15 for testing the lunar environment in preparation for future NASA Artemis landers.
NASA is seeking industry proposals before July 10, 2023, for the development and demonstration of a next-gen LTV for crewed and uncrewed exploration of the moon during Artemis missions.
Blue Origin joins SpaceX in design, development, testing and verification of its lander concept to enable recurring astronaut expedients to the moon per the NASA Artemis program.
Nine-by-nine-foot fixtures were designed with tight tolerances for thermal and moisture stability, supporting NASA’s push to enable in-orbit construction of hardware for future space programs.
NASA invites everyone to its global virtual NASA Social event for the Artemis I launch of the SLS rocket carrying the Orion spacecraft from the Kennedy Space Center in Florida on Aug. 29, 2022.
The agency’s Orion spacecraft — showcasing an abundance of composite components and structures — launched 1:47 a.m. on Nov. 16, and is on its way to the moon as part of the Artemis program.
Sarah Cox, materials engineer at NASA, talks about her experience at NASA working with composites in the space travel space.
Mechanisms to drive solar array panels, a composite universal stage adapter and central network electronics supply drive Artemis missions forward.
Selected companies will develop Artemis lander design concepts, evaluating their performance, design, construction standards, mission assurance requirements, interfaces, safety, crew health accommodations and medical capabilities.
Lockheed maintains an OPOC for up to 12 composites-intensive vehicles over the course of the Artemis moon missions, reduces cost by 50% per vehicle.