Gurit extends existing wind core kit supply contract
Three-year contract to generate business for all ten Gurit kitting sites, including new facilities.
Photo Credit: Getty Images
On March 1, Gurit (Zurich, Switzerland) announced a three-year core material kit engineering and supply contract with a major wind turbine manufacturer. The agreement is a continuation of a long-standing partnership with similar volumes and is expected to generate net sales of CHF 270-350 million (approximately USD $290-377 million) over the 2021-2023 period. The contract will generate business for all ten kitting sites, including the new facilities being set up in India. Gurit Kitting will provide additional benefits with the reduction of the Total Cost of Ownership for the customer through innovative design solutions.
“The extension of our existing partnership is the result of our team’s ability to deliver consistent high quality and builds on our global footprint and focus on innovative engineered core kits,” says Andreas Kipker, general manager of Gurit’s Kitting business unit.
Related Content
-
Novel composite technology replaces welded joints in tubular structures
The Tree Composites TC-joint replaces traditional welding in jacket foundations for offshore wind turbine generator applications, advancing the world’s quest for fast, sustainable energy deployment.
-
Materials & Processes: Fabrication methods
There are numerous methods for fabricating composite components. Selection of a method for a particular part, therefore, will depend on the materials, the part design and end-use or application. Here's a guide to selection.
-
Novel dry tape for liquid molded composites
MTorres seeks to enable next-gen aircraft and open new markets for composites with low-cost, high-permeability tapes and versatile, high-speed production lines.