Heat, vacuum and/or pressure advance from debulking prepreg layups to automated preforming of dry reinforcements for faster composites production.

Share

MTorres ACTI equipment for hot drape forming and preforms

MTorres used hot drape forming to preform undirectional tape blanks in the Clean Sky 2 IIAMS wing box program. Photo Credit, all images: IIAMS project, Airbus Defence and Space, MTorres.

 

This online sidebar for the March 2021 article, “Advancing the OOA infused wing box” aims to bring together what CW has written about hot drape forming over the years into one place and, hopefully, provide a useful resource. Below are excerpts from multiple articles —  from 2010 to 2020 — with photos to help demonstrate how hot drape forming helps to automate composites production.

 

2010, GKN Aerospace, A400M spars

From: “Composite wing spars carry the enormous turboprop engines”

Phil Grainger, GKN Aerospace’s technical director and chief technologist, explains that building such a large part manually, as was done on early A400M spars, is slow, with typically a 0.75kg/hr (1.5 lb/hr) lay down rate. However, during serial production, the part will be layed up flat, using an automated tape layer (ATL) and subsequently hot drape formed into the C-section shape. At this point, layup rates of 25 kg/hr (50 lb/hr) will be achievable. Grainger emphasizes that these are achievable average rates over a shift, on real parts.

To automate the process, GKN Aerospace has invested in a large ATL with a 20m/63-ft bed, manufactured by MTorres (Navarra, Spain). The ATL is able to lay the complex preforms in their developed shapes from unidirectional prepreg, using a 977-2 carbon fiber/toughened epoxy uni tape supplied by Cytec Engineered Materials Ltd. (now Solvay, Wrexham, U.K.). To form the C-section, the preform will be moved from the tape layer to a hot drape former provided by equipment manufacturer Aeroform Ltd. (Poole, Dorset, U.K.). To facilitate pulling a vacuum, the layup will be sandwiched between two diaphragms made from Kapton polyimide film, supplied by DuPont Electronic Technologies (Circleville, Ohio). The space between the films will be evacuated and then infrared heating will be applied from above the part to raise the temperature to 60°C/140°F over a period of one hour. This ensures that even the material at the center of the thickest section at the root end is warmed uniformly to the same temperature. Pressure then will be gently applied to form the laminate, constrained by the two diaphragms over a lightweight tool that accurately represents the inside surface of the spar. This C-forming process is achieved very slowly over a period of 20 minutes. (After forming, the Kapton films are discarded.)

 

2014, FACC, A321 flaps

From: “FACC AG: Aerocomposites powerhouse”

In Plant 3, a wide variety of flaps, fairings and flight control surfaces are manufactured. Here also, efficiencies from automated tape laying (ATL) and hot drape forming are exploited. The latter applies heat and pressure to flat ATL preforms using a core and flexible forming pad to produce three-dimensional shapes (see Fig. 7). One example is ongoing A321 flap production, which uses a cutting-edge automated workcell custom-engineered by Fill (Gurten, Austria).

automated tape laying and hot drape forming at FACC

Automated tape laying and hot drape forming at FACC. Photo Credit: FACC.

 

2018, Fill, automated preforming

From: “Automated Preforming, Part 7: Fill Gesellschaft”

Fill hot drape forming equipment Fill automation for aerospace

Photo Credit: Fill

In the recent tour articles Sara Black and I wrote about high-performance composites in Israel, we noted that most of the companies were using hot drape forming. In fact, at Elbit Cyclone, our tour guide Jonathan Hulaty stated, “I don’t know how you do this type of high-rate prepreg parts production without hot drape forming,” referring to beams and stanchions for Boeing 787 assemblies. Hot drape formers (HDF) are also seen as indispensable by FBM and Israel Aerospace Industries. 

Fill has supplied HDF systems for years, including several units in production at FACC. They are basically vacuum-forming systems, equipped with infrared or other types of heating elements and a reusable silicone rubber membrane to heat and compress—debulk—prepreg layups on their tools prior to cure. HDF becomes a key part in the complete aerocomposites production line shown below. 

 

2018, FBM, 787 parts

From: “Merger of entrepreneurial, metal-centric firms claims composites’ first”

CW is led first to a cleanroom, where workers lay up a variety of parts. This day, at a number of stations, each equipped with a computerized layup-assist computer screen, the focus is parts for the Boeing 787. Easy-to-understand touch screens clearly show the layup angles for each ply, and how they’re to be positioned on each tool. A “guillotine” machine from Century Design (San Diego, CA, US), with a 2m-diameter rotary table and knife blade in the center, enables fast cutting of angled plies from the carbon/epoxy prepreg. Tools for the 787 door surrounds are shaped steel mandrels, typically longer than wide, from a few centimeters long up to ~2m in length, used to produce hundreds of frames, brackets, and clips. An automated flatbed cutting table from Assyst-Bullmer Inc. (Wakefield, UK) is used by the layup technicians to cut up to 50 stacked plies in one operation.     

layup prior to hot drape forming at FBM

Small-part cutting, kitting and layup inside FBM’s cleanroom for a wide variety of smaller autoclaved parts. Phot Credit: CW, Sara Black.

FBM hot drape forming machine

FBM’s hot drape forming machine, supplied by Israeli company Electrotherm Industry, deletes intermediate debulking steps, shaping as many as 50 unidirectional plies in one shot, and is credited with accelerating FBM’s layup process prior to cure. Photo Credit: CW, Sara Black.

The cleanroom is dominated by a hot drape former (HDF). Made byElectroTherm Industry (Migdal HaEmek, Israel), the static machine (the company also makes moveable versions on carts) is a custom-made, vacuum-forming system, equipped with infrared heating elements and a silicone rubber membrane to heat and compress the composite layups on the tools, prior to cure. The HDF can shape as many as 50 stacked plies, says Poliker, with no intermediate debulking steps: “We were looking to eliminate process complexity, so we form the layups in one shot.” After the prepreg is heated and consolidated in the HDF, a caul is placed over the entire layup, prior to bagging. Made with a carbon fiber composite, the caul exhibits a rough surface finish. Poliker won’t reveal details of the proprietary material, but does say it can take the 177°C autoclave cure temperatures: “It simulates a matched-die tool.” He adds that the mandrel tools are reconditioned in-house, as needed. Bagging and consumables are supplied by Airtech International (Huntington Beach, CA, US). 

 

2018, Elbit Cyclone, 787 parts

From: “Serving the composites world in Israel and the US”

On the right, workers in the cleanroom for Boeing 787 parts lay up prepreg for an array of parts, from small clips and stanchions to complex J-, I- and C-beams, as well as multi-piece nose landing-gear doors. Prepreg is cut using a Assyst Bullmer (Wakefield, UK) automated fabric cutter and a guillotine machine for cutting thick stacks at any angle. The prepreg freezer is adjacent to the cleanroom. Hulaty notes that sometimes stacks of prepreg are cut, kitted and put back into the freezer. Aligned Vision (Chelmsford, MA, US) laser projection systems located throughout the cleanroom assist hand layup.

prepreg ply kits prior to layup and hot drape forming at Elbit Cyclone

Production ply kits in Elbit Cyclone’s 787 cleanroom. Prepreg plies are cut, kitted and either returned to freezer storage or moved to a laser projection-assisted layup station. Photo credit: Elbit Cyclone.

hot drape forming machine at Elbit Cyclone

Hot drape forming machines are used to debulk multiple prepreg layups at one time (only a single floor beam layup is shown here). Photo Credit: Elbit Cyclone.

Carbon fiber-reinforced plastic (CFRP) floor beam parts are being laid up onmale metal mandrels. Hulaty details the streamlined process, “We lay up the prepreg stacks first and then apply them to the mandrel. This saves a ton of time vs. applying piecemeal onto the tool. The layups are then covered, with a CFRP caul of our own design, which helps to ensure 100% repeatability in the parts.”

A hot drape forming machine sits along the back wall of the cleanroom, enabling debulking of many parts per cycle. “I don’t know how you do this type of high-rate prepreg parts production without hot drape forming,” says Hulaty in reference to parts such as beams and stanchions. And yet, he acknowledges this step is not the bottleneck, nor is the autoclave. “Machining at the end, after curing, is the bottleneck,” he maintains, explaining that for long floor beam parts, it is faster to lay up a simple stack and machine it after cure. “The autoclave is not the issue because we can stack a lot of parts to cure at one time,” he adds. “So, we actually get a good production rate per cure cycle.”

 

2018, IAI, aerostructures

From: “Israel’s aerodefense cornerstone poised for greater global outreach”

layup prior to hot drape forming at IAI

IAI’s composites production capability includes six cleanrooms equipped with overhead Virtek Vision laser projection systems to aid layup. Photo Credit: Israel Aerospace Industries

hot drape forming machine at Israel Aerospace Industries

IAI uses a hot drape forming machine to debulk thick prepreg layups en masse, eliminating the need for conventional intermediate debulking steps. Photo Credit: Israel Aerospace Industries

IAI’s composites operations span parts fabrication and assemblies for business jets and commercial aircraft, unmanned aerial vehicles (UAVs) and military aircraft. Parts produced include vertical and horizontal stabilizers, rudders, wing structures, engine nacelles, floor beams, door surrounds, structural bulkheads, ribs and stiffeners, control surfaces, fairings and radomes. Numbered among its manufacturing capabilities are prepreg hand layup and automated tape layup (ATL), hot drape forming, autoclave and out-of-autoclave cure (OOA) including liquid molding processes, such as resin infusion and resin transfer molding (RTM), plus complex bonding and assembly. The company also designs and builds its own tooling, holds all key aerospace and composites quality certifications and provides quality assurance via comprehensive nondestructive testing and inspection.

  • IAI’s production capacity is significant, with 10 autoclaves, seven of which belong to the Aero-assemblies Div. and range in size from 4.5m long and 2m diameter, to the largest at 14m long and 4.7m diameter.
  • Prepreg layups are debulked prior to cure using a hot drape forming machine (6.9 by 2.7 by 3.1m) from Electrotherm Industry (Migdal HaEmek, Israel).

 

2020, Strata, A350-900 inboard flaps

From: “Strata delivers 100 shipsets of inboard flaps for A350-900”

Designed to increase the total lift capability of the wing of an aircraft, an IBF [inboard flap] is mounted on the trailing edge of the wing to increase the wing’s surface during take-off and landing and improve stability during flight. Strata says it plans to fully automate the IBF manufacturing process, using hot drape forming (HDF) and computer-controlled robotic automated tape layup (ATL) machines, which gained first part qualification (FPQ) and FAI design and quality verifications early this year.

As part of the process, the company says the HDF machine preforms carbon fiber components for aircraft parts, enabling faster production of high-quality composite parts, and its infrared radiation heating system quickly and evenly softens carbon fiber to deliver accurate parts are said to be free of stress-wrinkling. Further, Strata’s two ATL machines lay unidirectional prepreg materials onto a flatbed before being transferred to a mold for further processing. According to Strata, its work envelope of 2.5 meters by 10 meters enables automated processing of large composite layups, eliminating the need for a separate ultrasonic cutting machine, and reducing processing times.

 

2020, Techni-Modul, wing rib and stringer

From: “Compression RTM for production of future aerostructures”

“For us, OPTICOMS was also about automation,” says Chevallet. Techni-Modul Engineering supplied not only a C-RTM injection system for the OPTICOMS project, but also a pick-and-place robot and a hot drape forming (HDF) machine, all integrated into a fully automated production cell. … “We have automated the classic manual stacking of plies using robotic pick and place,” says Chevallet. “The robot picks up plies from an automated cutter and transfers these to the heated preform tool which sits on a compaction table [Steps 1 and 6].” A peel ply (blue film in Step 6), breather (white material in Step 6) and hinged reusable vacuum membrane (light blue at left in Steps 2 and 6) are applied, followed by vacuum and heat to preshape and remove air from the textile stack (hot drape forming, HDF) while melting the thin thermoplastic veils to create a compacted preform.

“How many plies you can compact at one time depends on the materials and shape of the part,” Chevallet explains. “For parts with low curvature, like a wingskin, then you could possibly compact every 50 plies. The OPTICOMS rib, however, has 90-degree angles, and the test I-beam stringer has T-shapes, so you must be careful not to form wrinkles in the plies during preforming.” He adds that such complex shapes may require compaction every 5-8 plies, but can still be part of a high-volume, industrialized process: Stack plies, 2-minute HDF compaction, reopen and stack again, followed by repeated compaction cycles with a final cooling of the preform on the tool before transfer to the RTM mold.

Nanosilica Filled Adhesives
Renegade Material Composites
Harper International Carbon Fiber
pro-set epoxy laminate infusion tool high temp Tg
Custom Quantity Composite Repair Materials
Composites One
world leader in braiding technology
BARRDAY PREPREG
3D industrial laser projection
Toray public database prepreg materials
3D industrial laser projection
CAMX 2024
Carbon Fiber 2024
HEATCON Composite Systems
KraussMaffei Metering Systems
Harper International Carbon Fiber

Related Content

Work In Progress

MFFD thermoplastic floor beams — OOA consolidation for next-gen TPC aerostructures

GKN Fokker and Mikrosam develop AFP for the Multifunctional Fuselage Demonstrator’s floor beams and OOA consolidation of 6-meter spars for TPC rudders, elevators and tails.

Read More
Infrastructure

Materials & Processes: Composites fibers and resins

Compared to legacy materials like steel, aluminum, iron and titanium, composites are still coming of age, and only just now are being better understood by design and manufacturing engineers. However, composites’ physical properties — combined with unbeatable light weight — make them undeniably attractive. 

Read More
RTM

Materials & Processes: Fabrication methods

There are numerous methods for fabricating composite components. Selection of a method for a particular part, therefore, will depend on the materials, the part design and end-use or application. Here's a guide to selection.

Read More
Glass Fibers

Novel dry tape for liquid molded composites

MTorres seeks to enable next-gen aircraft and open new markets for composites with low-cost, high-permeability tapes and versatile, high-speed production lines.

Read More

Read Next

Trends

CW’s 2024 Top Shops survey offers new approach to benchmarking

Respondents that complete the survey by April 30, 2024, have the chance to be recognized as an honoree.

Read More
Pressure Vessels

Composites end markets: Energy (2024)

Composites are used widely in oil/gas, wind and other renewable energy applications. Despite market challenges, growth potential and innovation for composites continue.

Read More
Filament Winding

From the CW Archives: The tale of the thermoplastic cryotank

In 2006, guest columnist Bob Hartunian related the story of his efforts two decades prior, while at McDonnell Douglas, to develop a thermoplastic composite crytank for hydrogen storage. He learned a lot of lessons.

Read More